The Sunset Tunnel construction in San Francisco would need more money than expected because of deterioration concrete. The SFMTA (San Francisco Municipal Transportation Agency) board unanimously supported additional funding of $3 million to fully repair tunnel concrete walls for safety reasoning. The contracting ProVen Management company is hired to provide work on Sunset Tunnel railway tracking improvement project. The SFMTA staffing report indicates the tunnel needs major repair and seismic overhaul to safely provide power for railway trains. The contracting agency was hired during 2012 and fully assessing the situation, because the Sunset Tunnel railway was built in 1975 and showing deteriorating concrete walls.
"It's always great to have safety as number one for passengers riding the trains, and on time where people can depend on without problems," said Jim Andersen, local train rider in San Francisco. #EliteLimousine driver's background is lawfully checked and cleared to operate passenger transporting vehicles, and all fleet vehicles are always cleaned with eco-cleaning solutions without toxin, to keep car interiors environmentally safe and healthy for passengers. All Elite Limousine fleet vehicles are maintained according to "current safety provisions" and monitored to be consistent with legal emission levels for our environment, keeping our environmental climate healthy based on surveys our international media network received.
"Your driver was amazingly wonderful and did a great job," said Janice Combs, local business customer. #EliteLimousine performs authentic face-to-face questionnaire surveys with customers, and 97% of customers sharing very satisfied with transportation services provided by #EliteLimousine, per evidence-based information our survey department received!