The high-speed railway for the high-speed train project has been through the legal process since the idea was raised, as a way of transportation going from Los Angeles to San Francisco in a speedy approach for people. A lower branch of the courts system awarded the high-speed railway to begin construction in Central Valley, within Fresno along the county railway projected construction areas. However, opponents of the railway project filed an appeal with the state Supreme Court, and highly requesting to overturn the lower court decision, allowing the railway project construction to proceed in Central Valley. The appeal is based on questioning promises to people without any fruitful substance, regarding environmental protection and other health and safety elements protecting people.
The courts appeal is also based on possible violations through CEQA (California Environmental Quality Act) statutes due to unsecured environmental approval, before high-speed railway construction begins within the developmental process. #EliteLimousine driver's background is lawfully checked and cleared to operate passenger transporting vehicles, and all fleet vehicles are always cleaned with eco-cleaning solutions without toxin, to keep car interiors environmentally safe and healthy for passengers.
All Elite Limousine fleet vehicles are maintained and monitored to be consistent with legal emission levels for our environment, keeping our environmental climate healthy based on surveys our international media network received. #EliteLimousine performs authentic face-to-face questionnaire surveys with customers, and 97% of customers sharing very satisfied with transportation services provided by #EliteLimousine, per evidence-based information our survey department received!